SR 12 / Rio Vista Bridge

image

Rio Vista Bridge Preliminary Study

The Solano Transportation Authority and the city of Rio Vista have been exploring alternatives for improving long-term transportation mobility on State Route 12 through Rio Vista and across the Sacramento River. The existing Sacramento River Crossing at Rio Vista is a lift bridge that completes a vital link between Interstate 80 and Interstate 5.

The project team is investigating the existing route as well as routes north and south of the airport and a southern corridor along the river bluffs. Operation of the lift bridge causes frequent traffic delays. As the community grows and regional traffic increases, the delays are expected to worsen. Replacement of the lift bridge will eliminate traffic back-ups associated with existing bridge operations.

Public Meeting held February 25, 2010. Download Public Meeting Recap here. Download PowerPoint Presentation here. Download the alternative simulation videos here: Airport Road | Existing Route | Southern.

PROJECT NEWSLETTER Winter 2010

FACT SHEET Winter 2010

POTENTIAL CORRIDOR ALTERNATIVES MAP

DRAFT PRELIMINARY BRIDGE REPORT JUNE 2010

The STA is releasing the Draft Rio Vista Preliminary Bridge Report for public review and comment. Links to the report and all attachments are listed below. The open comment period extends 60 calendar days from June 10, 2010 through August 9, 2010. To submit comments, please remit them via mail or email to the following:

  • Mail:
    Solano Transportation Authority
    Attn: Janet Adams, Deputy Executive Director/Director of Projects
    One Harbor Center, Suite 130
    Suisun City, CA 94585
  • Email:
    jadams@sta-snci.com

    SR 12 Rio Vista Bridge Draft Study Report June 2010 (715 KB)
    Att A - Vicinity Map (124 KB)
    Att B - Previously Studied Alternatives Exhibit (639 KB)
    Att C - Potential Corridor Alternatives Exhibit (1.2 MB)
    Att D - Structure Advanced Planning Study (APS) (3.7 MB)
    Att E - Tunnel Design Memorandum (18.5 MB)
    Att F - Cost Estimates (234 KB)
    Att G - Preliminary Environmental Study (2.5 MB)
    Att H - Traffic Forecasting Memorandum (14.3 MB)
    Att I - Hydraulics Analysis Memorandum (3.1 MB)
    Att J - Public Comments (5.8 MB)